3rd Methanol Plant


Project Details
Client:
Fanavaran Petrochemical Company
Project Location:
Bandar Imam, Iran
Capacity:
1,000,000 TPA
Areas of Activity:
Petrochemical and Chemical Plants
Services Performed:
Engineering, Procurement, Construction Supervision
Licensor:
Haldor Topsoe
Participant(s):
Snamprogetti S.p.A
Project Status:
Completed and in Operation

Description:

The 3rd Methanol Plant is designed to produce 1,000,000 TPA of methanol grade AA based on the license and know-how of Haldor Topsoe AS.

The product application is intermediate of various chemicals products, mainly MTBE and formaldehyde.
 
The project feedstock is sweet natural gas from Bid Boland C2+ Extraction Plant as well as Co2 from Razi Petrochemical Complex Ammonia Plant and Arvand Petrochemical Company MEG Plant.
 
Fajr Petrochemical Complex in the Special Petrochemical Economic Zone supplies the project utilities.